189 High Road

 

 

Five-storey Concrete Frame with a Basement.

 

Quorum has been responsible for design, coordination and detailing of the new concrete frame. 

 

Our scope included: 

-Substructure structural design 

-Value engineering

-Concrete Frame design and rebar detailing