Culross Street

Temporary works design for structural alterations to a residential property in Mayfair, London.

 

Quorum services included:

– Temporary works methodology and step-by-step construction sequence

– Strongboy propping and a new PFC lintel at the garage façade

– Acrow prop lines supporting the ground floor joists while new steel beams were installed

– 3D staging model showing every step from existing to proposed, used to agree the sequence with the design team and contractor

Explore the temporary works sequence

Step through each stage from existing to proposed. Drag to rotate, scroll or pinch to zoom.