Windmill Hill

Windmill Hill     New concrete structure for a showroom with flats on top.    Our services included:  – Specification for ground investigation sub-contractor – Concrete structure design and detailing – Steel structure design and detailing  ...

Frognal Lane

Frognal Lane     Temporary works design for basement excavation.    Quorum services included: – Developing construction methodology and sequence – Temporary steel struts design  – Part of the concrete ground floor slab design that will be used...

Romilly Park Coffee

Romilly Park Coffee     Five-storey Concrete Frame with a Basement.   Quorum has been responsible for design, coordination and detailing of the new concrete frame.    Our scope included:  -Temporary works design  -Substructure structural design  -Value...

189 High Road

189 High Road     Five-storey Concrete Frame with a Basement.   Quorum has been responsible for design, coordination and detailing of the new concrete frame.    Our scope included:  -Substructure structural design  -Value engineering -Concrete Frame design...

Bellvue House

Bellvue House    Eight Storey Residential Development with 5 single-storey townhouses to the rear Quorum have been responsible for design and detailing of concrete frame and concrete slabs for the townhouses to the rear. Other projects WEPA – Slab Model26 May,...