WEPA – Slab Model

WEPA – Slab Model     Redevelopment of the decommissioned production facility into a warehouse.    Quorum led design team on this project to develop architectural, structural, and MEP design for the decommissioned production facility into a warehouse to...

Windmill Hill

Windmill Hill     New concrete structure for a showroom with flats on top.    Our services included:  – Specification for ground investigation sub-contractor – Concrete structure design and detailing – Steel structure design and detailing  ...

Rockwool Raw Materials Hardstanding

Rockwool Raw Materials Hardstanding           Other projects WEPA – Slab Model26 May, 2022 Windmill Hill26 May, 2022 Rockwool Raw Materials Hardstanding26 May, 2022 Rockwool New Canopy26 May, 2022 Frognal Lane26 May, 2022 Severn Trent Anaerobic...

Rockwool New Canopy

Rockwool New Canopy     New steel link bridge design and detailing.    Our services included:  – Existing structure  and services survey. – Specification for ground investigation sub-contractor – Foundations and steel structure design and...

Frognal Lane

Frognal Lane     Temporary works design for basement excavation.    Quorum services included: – Developing construction methodology and sequence – Temporary steel struts design  – Part of the concrete ground floor slab design that will be used...